New sewage pipes to deal with rain

The bathroom and shower area at Sunlight House is located on the ground floor and sometimes flooded during rain storms. To improve hygiene, with funds supplied by the Consular Club of Ho Chi Minh, the sewage system and floor of the bathroom was renewed. Rain comes down, so improvements were done to the roof to help avoid flooding at the bottom.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *